CARE International Indonesia (CII), as an international NGO, has carried out large scale operations in Indonesia, encompassing emergency operations, transitional activities centered on agriculture and nutrition and a range of development initiatives in such areas as water and sanitation, health and micro-credit.
CARE International Indonesia in Makassar, South Sulawesi is currently recruiting the following position:
JOB
TITLE : DRAFTER (CONSULTANT)
DEPARTMENT/PROJECT : PROGRAM/KOTA II
REPORTS TO : WATSAN SPECIALIST
The following is the Terms of Reference TOR for above position.
INTRODUCTION
KOTA project will be implemented in three cities in Makassar,Jayapura,and Kupang. Target users from project proposal to be served about 7.500 people on clean water and around 2.500 people on sanitation facilities. By the time we calculated the spread of location and load of each unit estimated, it seen not less than 69 site locations which will be held in three cities. To facilitate and accelerate theprogram in which the construction should be started as early as the month of October 2011. Therefore to support the implementation and construction preparation will need DED and RAB for the material procurement process. Because the limitation of time, it will require the assistance of DED drafter to finish the as build drawing and the RAB.
Drafter will begin its activities in early August 2011 and is expected to be completed by the end of November 2011. Initial planning period is begun on August 2011 and the finalizationfrom September until October 2011. While November is the time of revision or addition drawing if necessary.
Field measurements will be performed by technical staff from CARE International Indonesia in July until August 2011. The drafter will receive input from the field measurements later and developed further in some design and worksheet that will be assisted by Watsan Specialist and approved by technical responsibility of the AMPL and project manager. If necessary drafter can visit to the field in several locations that are considered important as pilot project depand on the availability of funds.
Thereforethe project will required 3 drafters for construction design who will work in the short term. The task is to complete the design drawings (DED) and make the RAB based on the format already agreed between the Watsan Specialist, Project Officer of each cities, each region technical CFs, and also Project Manager, and communities representative.
AIMS
+ Support the technical work plan specially construction activityrelated to water and sanitation.
+ Prepare and completing the Detail Engineering Design, and also set up a completed as built drawing included some detailed and steel calculation.
+ Prepare and complete BoQ and RAB from template that had been prepared before by technical team for each location in which the as built drawing have been approved
SCHEDULLE
Design implementation schedule is planned for 4 months, from August 1st to30 November 2011
PACKETS ALLOCATION
The number and types of packets can still be changed according to the conditions and will be divided proportionally
Drafter Duration (month) Packet Allocation
Communal Latrine Communal Septic Tank Public Tap Only Master Meter
Drafter #1 4 12 2 3 6
Drafter #2 4 12 2 3 6
Drafter #3 4 12 2 3 6
QUALIFICATIONS:
Education: Minimum
Diploma in related field;
Experience: Minimum 1year
Technical Skills:
+ Experience in designing construction of water sanitation facility
+ Experience in preparing RAB of water sanitation construction
Please submit your applications before August 10, 2011 to CARE International Indonesia,
Human Resources Unit:
recruit_527@careind.or.id
"Only
qualified applicants will be shortlisted"

No comments:
Post a Comment