DAI,
implementer of the USAID funded Indonesia Urban Water, Sanitation and
Hygiene Penyehatan Lingkungan Untuk Semua (IUWASH PLUS) Project,
invites qualified bidders to submit proposals/bids for : "Service
Provider for Participatory Development of Detailed Engineering Designs
(DEDs) for IPLTs in Deli Serdang and Tebing Tinggi, North Sumatra"
Background
The USAID Indonesia Urban Water, Sanitation and Hygiene, Penyehatan Lingkungan Untuk Semua (IUWASH PLUS) program is a five-year initiative designed to assist the Government of Indonesia (GOI) in increasing access to water supply and sanitation services as well as improving key hygiene behaviors among urban poor and vulnerable populations. USAID IUWASH PLUS works with governmental agencies, the private sector, NGOs, communities and others to achieve the following "high level" results:
1. An increase of one million people in urban areas with access to improved water supply service quality, of which at least 500,000 are from the poorest 40% of the population (also referred to as the “Bottom 40%” or “B40”), vulnerable groups or Indonesia’s eastern provinces; and
2. An increase of 500,000 people in urban areas with access to safely managed sanitation and all of whom are from the "B40", vulnerable groups or Indonesia’s eastern provinces.
To ensure that improvements in access to WASH services are sustained, USAID IUWASH PLUS is guided by a development hypothesis that focuses on strengthening service delivery systems, so they can more effectively reach the poorest and most vulnerable segments of the population. In order to achieve this at scale, the program undertakes activities through four interrelated components, including: 1) improving household WASH services; 2) strengthening city WASH institutional performance; 3) strengthening the WASH financing environment; and 4) advancing national WASH advocacy, coordination and communication.
Objectives
1. Increase access to safely managed sanitation
in Kab Deli Serdang and Kota Tebing Tingga, both IUWASH PLUS collaborating
cities, through development of DED for IPLT rehabilitation (Deli Serdang) and
new IPLT (Tebing Tinggi).
2. Introduce and document a participatory IPLT
design process in two field locations in Indonesia, to review technical options
with local stakeholders as an opportunity to build the capacity and commitments
of Deli Serdang and Tebing Tinggi owners and operators.
Working Arrangements and Timing
The selected local implementer
(vendor) will work under the supervision of the
North Sumatra Urban Sanitation Specialist, who is supported by the IUWASH PLUS
National Sanitation Specialist. The assignment is expected to be completed
within four months. The assignment includes all travel to Deli Serdang and
Tebing Tinggi by consultant team.
Required Qualifications and Experience
IUWASH PLUS will seek a local implementer
(vendor) to implement the above work of which must have the following qualification:
·
Team Leader
o
Minimum S-1
bachelors’ degree in environmental/Civil/Chemical engineering
o
Minimum 5-10
years’ experience in water and sanitation sector, especially in the design of
IPLT (Septage Treatment Plant) or domestic WWTP (Waste Water Treatment Plant).
· Civil Engineering
o
an S-1 bachelors’
degree in Civil Engineering
o
Minimum 5 years’
experience in water and sanitation sector, especially in the design of IPLT
(Septage Treatment Plant) or domestic WWTP (Waste Water Treatment Plant).
· Other staff such
as: assistant, drafter, electrical, estimator
o
Minimum have
successful past performance and experience in similar field in the design of
IPLT (Septage Treatment Plant) or domestic WWTP (Waste Water Treatment Plant)
The selected local implementer (vendor) shall
propose the personnel/team compositions and qualifications based on the
required tasks and deliverables stated in previous sections
For
those who match the qualifications, IUWASH PLUS inviting you to submit
proposal, as the files attached or check the link as follows :
https://www.iuwashplus.or.id/ archives/lsic/req-nsr-18-0018- service-provider-for- participatory-development-of- detailed-engineering-designs- deds-for-iplts-in-deli- serdang-and-tebing-tinggi- north-sumatra
Thank you very much for your kind attention & best cooperation.
No comments:
Post a Comment