Monday, February 12, 2018

ZSL IP- calling for proposal of IWMS

Zoological Society London Indonesian Programme (ZSL IP) is calling for proposal of

Consultation Services for Integrated Water Management System & Integrated Fire Protection


&

Monitoring System

The Zoological Society of London is an international wildlife conservation organization with a focus on science-based and pragmatic solutions. ZSL has been active in Indonesia for about 10 years, with a particular focus on the overlap between industrial development and biodiversity conservation. ZSL Indonesia is based in Bogor, West Java, with existing field projects in Jambi and South Sumatera. Currently, we are Searching for

Integrated Water Management System & Integrated Fire Protection & Monitoring

Terms and Condition

Start Date

:

March, 2018

Duration of Contract

:

11 Months

Working Area

:

Palembang.

Reporting to

:

Private Sector/Production Manager

Background

A part of the Kelola Sendang project landscapes are peatlands already cultivated for various purposes, such as industrial plantation forests and oil palm plantations and carbon sequestration and storage. In addition, the area of ​​peatland is also used by the community for cultivation activities. The sustainability of peatland management is strongly influenced by the water system, especially the water level in accordance with the needs of each management unit. The dynamics of water flow in the canal flowing in a hydrological area of ​​peat (KHG) is strongly influenced by the management of the peat dome which is a water reservoir and water regulator. In addition, the construction of canals also affects the sustainability of peatlands. Canals created by cutting the contours will lead to water draining that accelerates subsidence and drought, leaving peat at high risk of burning.

In the future, the water demand in peatlands will be an important issue that should be addressed by various parties as it may create a conflict of interest between its users, As part of the solution for land fire control and sustainable peatland management, KS encourages integrated water management system in KHG S. Merang - S. Ngirawan as a model, taking into consideration the diversity of peatland uses, carbon pools and storage areas, plantations , oil palm plantations and community cultivation areas.

Scope of Work

1. Pre-Survey

* Collect Secondary Data, e.g. soil map, topography map, peat depth map, canal network, water regulator infrastructure, debit and water level measurement, climate data and water management system. Another data should be collected and compiling e.g. aerial photo, drone photo, Landsat Imagery and LIDAR data’s,

* Prepare equipment and materials (e.g. GPS, Compass, Data Tabulation, Stationery and other survey equipment)

* Prepare and provide man power and experts

* Prepare and provide workplan

* Conduct coordination meeting with key stakeholders to present workplan and developed collaboration mechanism (Socialization of the project activity),

2. Field Survey

* Surface elevation and peat thickness survey, conduct surface elevation mapping and established marking (BM), peat depth distribution, checking of peat depth

* Hydro topography Survey and water management system, Measurement of river water level, hydraulic conductivity, detail water management system mapping,

3. Spatial Data Base Development

4. Development of Interface (connection program) to Water Management System

5. Carbon Stock Field Measurement

6. Mapping and Reporting

Main Deliverable:

Model Prototype Integrated Water Management System in the KHG Merang-Kepayang

With other deliverables:

* Map of Hydro topography in the KHG Merang-Kepayang, scale 1:20.000

* Map of Peat depth in the KHG Merang-Kepayang, scale 1:20.000

* Map of Topography KHG Merang-Kepayang, scale 1:20.000

* Aerial Mosaic photo with drone

* Spatial Database of KHG Merang-Kepayang

* Interface Prototype Application Model to Support Integrated Water System Management in the KHG Merang-Kepayang

* Model Prototype peat land fire danger index in the KHG Merang-Kepayang

* Carbon Stock Estimation in the KHG Merang-Kepayang

Recruitment Qualifications

* Extensive and proven experience in the Water Management for 5 years
* Research Center, University or Consultant Firm with a long experience in the development of Integrated Water Management System and Integrated Fire Protection & Monitoring System
* Supported by competent Water Management and Fire Protection experts

* High level of written and spoken English, and demonstrated skills reporting in English

* Able to work according to schedule under field conditions

Application procedures

Interested firms/institutions shall submit the following documents:

1. Cover Letter

2. Technical proposal including the institutions profile with CV of team members, references of min.. 2 relevant experiences

3. Propose budget

The proposal shall submitted in English to <mailto:indonesia@zsl.or> indonesia@zsl.or cc’d <mailto:Lydia.Chandra@zsl.org> Lydia..Chandra@zsl.org by latest February 28, 2018 with placing the job title in the subject line Only short listed candidates will be notified. Applications received after the deadline will not be considered.

No comments: